← All Tools
SSI · JJ-CCR

27 steps

Pre-Dive Assembly

Full build-up from scrubber fill through sensor calibration. Complete all 27 steps before entering the water.

Start

12 steps

Pre-Breathe Sequence

Final unit check at the dive site. Verify loop integrity and oxygen control before splashing.

Start

11 steps

Post-Dive Actions

Rinse, inspect, and store the unit correctly after every dive to protect the scrubber and sensors.

Start